TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance lnstructions (Cont)
NOTE
All solenoids are removed and installed the
same.
(2)
Remove four screws (3), solenoid (4), and
preformed packing (5).
(3)
Loosen screw (6), remove plug (7), and
seal (8).
NOTE
Spool may be up in shift block. Pull handle to
release spool.
(4)
Remove spool (9) from block (10).
b. Installation.
(1)
(2)
(3)
Install seal (1), plug (2), and screw (3).
Install spool (4) in block (5).
Install preformed packing (6) and solenoid (7)
with four screws (8).
(4)
Aline and install cover (9) with four
screws (10).
c. Follow-on Maintenance.
(1)
Check operation of crane controls
(TM 9-2320-279-20).
(2)
Check for leaks.
END OF TASK
17-140.1