TM 9-2320-279-34-3
M977, M985, and M984E1 Crane Maintenance Instructions (Cont)
(5.1)
If removed or not previously installed,
install plastic edge protection (2.1)
around hose opening in beam (10).
NOTE
Two hoses for leg cylinder must be kept on
bottom of cylinder while being fed through to
other side.
(6)
(7)
(8)
(9)
(10)
Soldier A and Soldier B install
cylinder (3) in beam (10) while
Soldier C guides and pulls five hoses
(1, 2, and 7) through hole in
beam (10).
Aline cylinder (3) and install two
pins (11).
Install two quick pins (12) on pins (11).
Install hose (13) in beam (10) and
connect to tee (6).
Connect six hoses (1, 2, and 7) to valve
bodies (14, 15, and 16).
c.
Follow-on Maintenance.
Install outrigger
extensions (para 17-38).
END OF TASK
Change 3
17-167