4-127. HEAT/AIR-CONDITIONING CONTROL PANEL RELAY AND SWITCH
MAINTENANCE (M997, M997A1, M997A2)
This task covers:
a. Heat A/C Panel Removal
h.
Fuel Hi-Low Switch Installation
b. Heat A/C Panel Installation
i.
Fan Hi-Low Switch Removal
c. Heater Run-Start Switch Removal
j.
Fan Hi-Low Switch Installation
d. Heater Run-Start Switch Installation
k.
A/C On-Off Switch Removal
e. Heat On Light Removal
l.
A/C On-Off Switch Installation
f.
Heat On Light Installation
m. Rollover Switch Removal
g. Fuel Hi-Low Switch Removal
n.
Rollover Switch Installation
Manual References
TM 9-2320-280-24P
Equipment Condition
Battery ground cable disconnected (para. 4-73).
a. Heat A/C Control Panel Removal
b. Heat A/C Control Panel Installation
Remove four screws (1), two bolts (6), lockwashers (5) and panel (2) from harness bracket (4) and control
box (3). Pull panel (2) away from control box (3). Discard lockwashers (5).
Install panel (2) on harness bracket (4) and control box (3) with two lockwashers (5), bolts (6), and four
screws (1).
TM 9-2320-280-20-2
Change 3
4-319
NOTE
Check for loose or disconnected wires before installing panel.
INITIAL SETUP:
Applicable Models
M997, M997A1, M997A2
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Nine lockwashers (Appendix G, Item 169)
Two lockwashers (Appendix G, Item 138)
1
2
3
4
5
6