11-212. BLOWER ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Applicable Models
M996, M996A1
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Four blind rivnuts (Appendix G, Item 274)
Push on nut (Appendix G, Item 227)
Four blind rivets (Appendix G, Item 264)
Manual References
TM 9-2320-280-10
TM 9-2320-280-24P
Equipment Condition
• Battery ground cable disconnected (para. 4-73).
• Heater compartment panel removed
(para. 11-204).
NOTE
For instructions on replacement of rivets, refer to para. 10-66.
1.
Loosen two clamps (5) and disconnect hose ducts (2) from diverter box (8).
2.
Remove push on nut (3) and disconnect control linkage (4) from diverter box arm (17). Discard push
on nut (3).
NOTE
Prior to removal tag leads for installation.
3.
Disconnect harness leads 770 (12), 771 (13), and 772 (14) from blower motor leads (11).
4.
Remove four rivnuts (10), capscrews (6), washers (7), harness clamp (9), two ground terminals (15),
and blower assembly (1) from bracket (16). Discard rivnuts (10).
5.
Remove four rivets (20), diverter box (9), and foot (19) from blower assembly (1).
a. Removal
TM 9-2320-280-20-3
Change 2
11-321