3 - 1 7 . I N TAKE MANIFOLD MAINTENANCE (Cont'd)
FOLLOW-ON TASKS: • Install CDR valve bracket (TM 9-2320-280-20).
• Install air horn (TM 9-2320-280-20).
3.
Install four long studs (22), long capscrew (24), six studs (23), five capscrews (20), and sixteen
washers (19) on intake manifold (18).
4±
.
Tighten all studs (22) and (23) and capscrews (24) and (20) to 30 lb-ft (41 N
•
m), following torque s e q u e n c e
.
5.
Install harness brackets (6) and (17) on two studs (5) with lockwashers (8) and nuts (7).
6.
Install harness bracket (11) on studs (16) with two lockwashers (10) and nuts (9).
7.
Install harness clamp (1) on stud (4) with lockwasher (3) and nut (2).
8.
Install fuel filter line clamp (14) on stud (15) with lockwasher (13) and nut (12).
TM 9-2320-280-34
Change 1
3 - 3 7