TM 9-2320-283-20-1
FUEL SYSTEM.
3-31.
TURBOCHARER AIR CROSSOVER CONNECTION REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
B.
CLEANING AND INSPECTION (Continued).
8
All parts
b
Inspect
Refer to paragraph 3-5.
(continued).
C.
INSTALLATION.
9
Atomizer (11)
Install in item (14)
Put thread sealing tape
on threads.
10
Hose (4) and two
Put on item (5).
clamps (3).
11
Connection (14)
Put in place on item (7)
and new gasket
and in item (4).
(9).
12
Four screws (13)
Secure item (14) to item
and washers (12)
(7).
13
Two clamps (3)
Tighten.
14
Tube (10)
Install on item (11).
15
Elbow and tube
Put on item (6) and item
assembly (1)
(8).
16
Two clamps (2)
Tighten.
NOTE
Follow-on maintenance action required:
None.
3-134