TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 508 of 852

TM 9-2320-283-20-2
FRONT AXLE.
3-148.
STEERING ARM REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
A.
REMOVAL.
1.
Cotter pin (1)
Remove from items (2) and (3).
Discard item (1).
2.
Nut (2)
Remove from item (3).
3.
Link (3)
Remove from item (4).
4.
Cotter pin (8)
Remove from items (7) and (4).
Discard item (8).
5.
Nut (7)
Remove from item (4).
6.
Arm (4) and
Remove from item (6)
a.
Use a brass drift
key (5)
and hammer.
Do not
use heat.
b.
Discard item (5).
B.
CLEANING AND INSPECTION.
7.
All parts
Clean and inspect
Refer to paragraphs 3-4
and 3-5.
C.
INSTALLATION.
8.
Arm (4) and new
Install in item (6).
key (5).
9.
Nut (7) and new
Secure item (4) to item (6)
Torque to 350-490 lb-ft.
cotter pin (8)
Back off nut (7) to in-
stall pin (8), if neces-
sary.
10.
Link (3)
Install in item (4).
11.
Nut (2) and new
Secure item (3) to item (4)
Torque to 110-125 lb-ft.
cotter pin (1)
Tighten nut (2) more to
install pin (1), if
necessary.
NOTE
Follow-on maintenance action required:
None.
3-880


Back to Top