TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 616 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-169.
PRIMARY RESERVOIR REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
B.
INSTALLATION (Continued).
9.
Plug (7),
Coat threads with liquid
connector (9),
thread sealant and install
elbow (8), elbow
in item (6).
(2), reducer (3),
connector (4),
check valve (5),
and draincock
(14).
10.
Two lower brackets
Install and secure in
(12) and nuts
position on frame rail.
(10).
11.
Primary reservoir
Put in place on two lower
(6).
items (12).
12.
Two upper brackets
Install on item (6) and
(12) and tab (11).
frame rail.
13.
Two nuts (10).
Secure two upper items (12)
and (11).
14.
Two screws (15).
Install through four items
(12).
15.
Two nuts (13).
Install and tighten.
16.
Four air lines
Install and tighten.
Connect according to
(1).
identification tag.
NOTE
Follow-on maintenance action required:
Close air system draincocks and start engine (TM 9-2320-283-10).
Check air system for leaks (para 3-8).
Install
service deck assembly (para 3-239).
3-988


Back to Top