TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 648 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-174.
BRAKE TREADLE VALVE REPLACEMENT.
THIS TASK COVERS
a.
Removal.
b.
Cleaning and Inspection.
c.
Installation.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
TM 9-2320-283-10.
Air system draincocks
opened.
TEST EQUIPMENT
3-184.
Firewall double check
None.
valve removed from
brake treadle valve.
SPECIAL TOOLS
3-193.
Brake pedal double
None.
check valve removed
from brake valve.
MATERIALS/PARTS (P/N)
Tape, thread sealing
Item 32, Appendix C.
Solution, soap
Item 28, Appendix C.
Pin, cotter
(06853) 200981.
Pin, cotter
(06853) 210492.
PERSONNEL REQUIRED
SPECIAL ENVIRONMENTAL CONDITIONS
One (MOS-63S).
None.
REFERENCES (TM)
GENERAL SAFETY INSTRUCTIONS
TM 9-2320-283-10.
Engine off.
Transmission in neutral.
Park brake set.
TROUBLESHOOTING REFERENCES
Paragraph 2-11.
3-1020


Back to Top