TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 662 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-175.
TRAILER SUPPLY VALVE REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
C
INSTALLATION.
10 Plug (5), elbow
Install
Use thread sealing tape
(10), tractor
on threads.
protection pilot
valve (11), elbow
(12), and 90° male
elbow (4).
11 Trailer supply
Aline with mounting hole
valve assembly
and install.
(9).
12 Nut (6)
Install and tighten.
13 Knob (7)
Install on shaft of item (9)
Use small drift punch.
and secure with item (8)
driven through pinhole.
14 Two air lines (3)
Install and tighten.
NOTE
Follow-on maintenance action required:
Connect battery power (para 3-120).
Close air system draincocks and
start engine (TM 9-2320-283-10).
Check air system for leaks (para
3-8).
3-1034


Back to Top