TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 804 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-198. AIR DRYER REPLACEMENT (Continued).
LOCATION / ITEM
ACTION
REMARKS
C.
INSIALLATION.
9.
Dryer assembly
a.
Place in position on item
Ensure item (20) is
(23), clamp (6)
(4).
centered in mounting
with hose assembly
hole.
(14),
and clamp
b.
Secure in place with four
(6) with cable
items (1), eight items (2),
(7).
and four items (8).
NOTE
If air dryer was recently repaired, a new boot may be
provided.
If it
is, discard old boot and install new
boot on heater control wire.
10.
Wire (13), boot
Install on item (16).
(12), and nut
(15).
11.
Hose assembly
Install on item (17).
(14).
12.
Elbow (9).
Apply thread sealer and
Use thread sealing tape.
install on item (21).
13.
Connector (10).
Apply thread sealer and
Use thread sealing tape.
install in item (9).
14.
Tube assembly
Install on item (10).
(11).
15.
Hose (5).
Apply thread sealer and
Use thread sealing tape.
install on item (22).
3-1176


Back to Top