TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 818 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-199. AIR DRYER REPAIR (Continued).
LOCATION/ITEM
ACTION
REMARKS
E. ASSEMBLY. I
27. New O-ring (9)
Lubricate and install on
Use silicone grease
item (10)
lubrication.
28. Valve assembly
Install in item (2).
(3).
29. Connector (11)
Apply thread sealer and
Use thread sealing tape.
install in item (3).
30. Valve (13)
Apply thread sealer and
Use thread sealing tape.
install in item (2).
31. New O-ring (14)
Lubricate
Use silicone grease
lubrication.
32. Cartridge (15)
Screw into item (2) using
Torque to 375 lb.-in
a 3/4-inch socket wrench.
33. Connector (36)
Apply thread sealer and
Use thread sealing tape.
install in item (35).
34. New O-ring (19)
Lubricate and install on
Use silicone grease
item (20)
lubrication.
35. Piston (20)
Lubricate
Use silicone grease
lubrication.
36. Housing (24)
a. Insert items (20) and
Item (21) should be new.
(21).
b. Insert new item (25)
Rubber end goes in
first.
c. Install items (26) and
Torque to 50 lb.-in
(27).
37. O-rings (22) and
Lubricate and install on
Items (22) and (23)
(23)
item (24)
should be new.
Use
silicone grease
lubrication.
3 -1190


Back to Top