TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 579 of 1320

TM 9-2320-304-14&P
4-170.3
Organizational Maintenance Instructions (Cont)
b. Installation.
NOTE
Move hoses, as required, to position control
box and plate.
(1)
Install CHU control box assembly (1)
and plate (2) on fender (3) with four
screws (4), washers (5), and nuts (6).
Tighten nuts.
(2)
Install cover (7) on CHU control box
assembly (1) with four screws (8).
Tighten screws.
(3)
Connect connector MC185A (9),
connector MC82B (10), and
connector MC82A (11) on CHU control
box assembly (1).
c. Follow-on Maintenance.
(1)
Connect batteries (TM 9-2320-2790-20).
(2)
Remove wheel chocks
(TM 9-2320-279-10).
END OF TASK
Change 1


Back to Top