TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 587 of 1320

TM 9-2320-304-14&P
Organizational Maintenance Instructions (Cont)
b. Assembly.
NOTE
Perform step (1) if inserts were removed.
(1)
Install two inserts (1) in relay mount
bracket (2).
(2)
Install five socket modules (3), one
bracket (4), and two screws (5) to relay
mount bracket (2).
(3)
Install relay mount bracket (2), two
lockwashers (6), and screws (7) to
control box (8).
(4)
Install relay socket module (9) with
screw (10) and locking nut (11).
(5)
Install relays R51 (12), R52 (13),
R53 (14), R54 (15), R55 (16) to five relay
socket modules (3).
(6)
Install relay R56 (17) to relay socket
module (9).
c. Follow-on Maintenance.
Install CHU box
wiring (Para 4-34.2).
END OF TASK
Change 1
4-170.11/(4-170.12 blank)


Back to Top