TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 593 of 1320

TM 9-2320-304-14&P
4-175
Organizational Maintenance Instructions (Cont)
NOTE
Tag and mark wires prior to
removal.
Removecabletiesasrequired
.
(2)
Remove wire 1435 (4) from terminal (5),
wire 1474 (6) from terminal (7), and
wire 1466 (8) from terminal (9).
(3)
Remove collar (10), washer (11), sealing
ring (12), and wires 1435 (4), 1474 (6),
and 1466 (8) from junction box (3).
(4)
Remove two screws (13), lockwashers (14), and coverplate (15) from two clamp halves (16).
Discard lockwashers.
(5)
Remove two clamp halves (16) with proximity switch (17) as an assembly from main frame (18).


Back to Top