TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 63 of 1320

TM 9-2320-304-14&P
2-8.3
Operating Instructions (Cont)
Table 2-3. Operator’s Preventive Maintenance Checks and Services for CHU (After) (Cont)
Location
Item
No.
Interval
Item to Check/
Service
Procedure
Not Fully
Mission
Capable if:
NOTE
If hooks are missing or removed to replace lost pins, hook on opposite side must also be
removed to maintain balance.
3
After
Hooks
Check standard hooks (1), 6-ft. (183 cm)
hooks (2), half-height hooks (3), and hooks
(4) for missing or damaged pins (5) and
snapper pins (6).
Parts are
damaged or
missing.
If top hook (1) pin (5), or snapper pin (6) is
damaged or missing, remove pin (5) and
snapper pin (6) from 6-ft. (183 cm) hook (2).
Secure top hook with pin and snapper pin,
then secure 6-ft. hook in truck.
Parts are
damaged or
missing.
If recovery hook (4) pin (5), or snapper
pin (6) is damaged or missing, remove pin (5)
and snapper pin (6) from lower end of rail
transport strut (7) in stowed location. Pin
from slide arm (8) could also be used.
Parts are
damaged or
missing.
Change 3


Back to Top