TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 65 of 1320

TM 9-2320-304-14&P
2-8.5
Operating Instructions (Cont)
Table 2-3. Operator’s Preventive Maintenance Checks and Services for CHU (After) (Cont)
Location
Item
No.
Interval
Item to Check/
Service
Procedure
Not Fully
Mission
Capable if:
4
After
Bail Bar Lock
Check bail bar lock (1) for missing or
damaged pin (2) and lock pin (3) or
deformation greater than 3/16 in. (4.76 mm),
except handle.
Parts are
damaged or
missing.
5
After
Slide Arm
(a)
If truck is equipped with Container
Handling Unit (CHU), make sure slide
arm (4) has free movement.
Parts are
damaged or
missing.
(b)
Check for missing or damaged pins (5)
and lock pins (6).
If slide arm (4), pin (5), or snapper pin (6) is
damaged or missing, rail transport strut
pin (5), and snapper pin (6) can be used.
Change 3


Back to Top