TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 920 of 1320

Change 3
TM 9-2320-304-14&P
5-160
Direct Support and General Support Maintenance (Cont)
5-31.
LOAD HANDLING SYSTEM (LHS) MAIN MANIFOLD/BRACKET REPLACEMENT
(CONT).
(28)
Apply hydraulic oil to two preformed
packings (10).
(29)
Install two preformed packings (10) and
plugs (11) on hydraulic manifold (3).
Tighten to 3 lb-ft. (4 N
S
m).
(30)
Apply hydraulic oil to preformed
packing (6).
(31)
Install preformed packing (6) and
plug (7) on hydraulic manifold (3).
Tighten to 15 lb-ft. (20 N
S
m).
(32)
Install orifice plug (27) on hydraulic
manifold (3).
(33)
Apply hydraulic oil to preformed
packing (10).
(34)
Install preformed packing (10) and
plug (11) on hydraulic manifold (3).
Tighten to 3 lb-ft. (4 N
S
m).
(35)
Apply hydraulic oil to preformed
packing (4).
(36)
Install preformed packing (4) and
plug (5) on hydraulic manifold (3).
Tighten to 7 lb-ft. (10 N
S
m).
(37)
Apply hydraulic oil to preformed
packings (28, 29, and 30).
(38)
Install preformed packings (28, 29,
and 30), check valve (31), and plug (32)
on hydraulic manifold (3). Tighten to
8 lb-ft. (11 N
S
m).
(39)
Apply hydraulic oil to preformed
packing (8).
(40)
Install preformed packing (8) and
plug (9) on hydraulic manifold.
Tighten to 11 lb-ft. (15 N
S
m).


Back to Top