TM 9-2320-328-13&P-1
0052-3/(4 blank)
DRAFT
0052
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-422-10)
END OF TASK
END OF WORK PACKAGE
HWT2846A
NOTE
Perform Step 4 only when mission allows shutdown of pumping operations.
Step 4.
If main inlet cap is leaking, shut down pumping operations, shut off water supply, and
check if main inlet cap is tight and free from damage.
a.
If main inlet cap is loose or damaged, tighten loose or replace
damaged main inlet cap (WP 0339).
b.
If main inlet cap is tight and free from damage, notify Supervisor.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION