TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 656 of 1390

TM 9-2320-328-13&P-2
0203-2
DRAFT
0203
INSTALLATION
NOTE
Cab and pump operator’s panel warning buzzer installed the same way.
Pump operator’s
panel shown.
1.
Install buzzer audio alarm (4) on pump operator’s panel (5) with retainer (3).
2.
Connect connector (1) on buzzer audio alarm connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator’s panel (pump operator’s panel warning buzzer) (WP 0207)
2.
Install cab instrument panel E (cab instrument panel warning buzzer) (WP 0205)
END OF TASK
END OF WORK PACKAGE
HWT0002


Back to Top