TM-9-2320-338-10

TRUCK, CARGO, 8X8, M977A4

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-338-10 - Page 272 of 1120

When telescoping the boom, the TELESCOPE and HOIST control
levers should be operated at the same time.
Crane movement from one lever may be slower than the other when
operating two levers together.
3.
Move TELESCOPE control lever (3) to OUT position to extend boom (2) and move
HOIST control lever (4) to DOWN position to pay out cable (5).


Back to Top