Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
HEAVY-DUTY
WINCH
CABLE
Figure 12.
NOTE
This procedure is a two sol-
dier task.
3.
Clean and lubricate heavy-duty
winch cable with OE/HDO. (WP
0134)
NOTE
•
Complete drain and refill
of heavy-duty winch drum
gearbox after first 10
hours of heavy-duty
winch operation.
•
After initial 10 hour drain
and refill this procedure
TM 9-2320-341-10
0130
0130-21