Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
becomes an annual
requirement.
4.
Drain and refill heavy-duty recov-
ery winch gearboxes (both motor
end and gear end) with lubricant
appropriate to operating environ-
ment (refer to lubrication instruc-
tions for more information). (WP
0134)
DRAIN
FILL
BREATHER
Figure 13.
END OF WORK PACKAGE
TM 9-2320-341-10
0130
0130-22