TM-9-2320-343-10

TRUCK, CARGO, 8X8 M985A4 W/WINCH AND M985A4 W/O WINCH

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-343-10 - Page 514 of 1128

18. Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
13
9
13
M977 SHOWN
15
14
9
12
Figure 10.
NOTE
Do not place cable between tensioning device pulleys at this time.
When pulling cable through tensioning device, push sheave towards
frame rail to allow clevis to pass through.
19. Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
TM 9-2320-343-10
0084
0084-8


Back to Top