Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
trical lines and other obsta-
cles while operating crane.
Failure to comply may result
in injury or death to personnel.
CAUTION
Do not let cable become slack
or cable may get tangled on
drum.
(3) Move HOIST control lev-
er to UP position to take
up cable. Move BOOM
control lever to UP posi-
tion to raise boom.
Cable does
not reel in or
boom does
not raise.
(4) Move HOIST control lev-
er to DOWN position to
pay out cable. Move
BOOM control lever to
DOWN position to lower
boom to horizontal posi-
tion.
Cable does
not pay out
or boom
does not
lower.
CAUTION
•
Keep hook block at least
one ft. (30 cm) from end
of boom. If hook block hits
end of boom it may
damage cable or hook
block and crane will lose
power. Wait six seconds
for power and check
crane for damage.
TM 9-2320-343-10
0144
0144-40