TM-9-2320-343-10

TRUCK, CARGO, 8X8 M985A4 W/WINCH AND M985A4 W/O WINCH

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-343-10 - Page 898 of 1128

Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
movement of crane. Moving
lever to full travel will cause
faster movement of crane.
b.
Check control levers for mal-
function, proper response,
obvious damage, missing
parts, binding, and extreme
looseness.
Controls
malfunction,
bind, or do
not re-
spond.
c.
Rotate and telescope boom:
WARNING
Ensure area is clear of per-
sonnel prior to moving
SWING lever. Boom should
be swung slowly enough so
crane operator has complete
control. Failure to comply may
result in injury or death to per-
sonnel.
(1) Move SWING control
lever to CW position to
turn boom clockwise.
Boom does
not turn
clockwise.
TM 9-2320-343-10
0144
0144-38


Back to Top