TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 1072 of 1144

TM 9-2320-361-24-2
0467 00
0467 00-24
MAINTENANCE ALLOCATION CHART (MAC) (Contd)
TM 9-2320-361-24-2
0467 00
0467 00-24
Table 3. Remarks.
REFERENCE
CODE
REMARKS
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
Perform PMCS as shown in TM 9-2320-361-10.
Engine overhaul will be in accordance with DMWR 9-2815-210.
Welding will be in accordance with TC 9-237.
Repair of lines and fittings will be in accordance with TM 9-243.
Test and repair of radiator will be in accordance with TM 750-254.
Repair of alternator will be in accordance with TM 9-2920-225-34.
Repair of starter will be in accordance with TM 9-2920-243-34.
Repair of batteries will be in accordance with TM 9-6140-200-14.
Transmission repair and overhaul will be in accordance with TM 9-2520-246-34.
Transfer case overhaul will be in accordance with TM 9-2520-246-34-1.
Overhaul of front and rear axle will be in accordance with NMWR 9-2520-587.
Repair, inspection, and storage of tires/tubes will be in accordance with
TM 9-2610-200-14.
Repair of frames will be in accordance with TB 9-2300-247-40.
Metal body repair will be in accordance with TC 9-510.
Overhaul of front winches will be in accordance with NMWR 9-3830-501.
Refer to kit installation instructions for kit installation.
Inspection of brake lines will be in accordance with TB 9-2300-405-14.
Service/inspection of winch/hoist wire rope/cables will be in accordance with
TB 43-0142.
Repair of canvas will be in accordance with FM 10-16.
Inspection and repair will be in accordance with TM 9-2815-210-34-1.
Inspection and repair of brake drums will be in accordance with TM 9-4910-482-10.
END OF WORK PACKAGE


Back to Top