TM 9-2320-361-24-2
0349 00
0349 00-4
TRANSMISSION POWER TAKEOFF (PTO), COVER, AND GASKET MAINTENANCE (Contd)
TM 9-2320-361-24-2
0349 00
0349 00-4
END OF WORK PACKAGE
INSTALLATION (Contd)
8.
Install new gasket (2) and cover (3) on PTO (1) with six new lockwashers (4) and screws (5).
9.
Fill transmission to proper fluid level (WP 0018 00).
10.
Connect battery ground cable (WP 0126 00).
11.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
1
5
4
3
2