TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 718 of 1144

TM 9-2320-361-24-2
0394 00
0394 00-2
BUMPER STEP KIT REPLACEMENT (Contd)
REMOVAL
1.
Remove safety pin (8) from pin (10).
2.
Remove pin (10) from bumper step (9) and bracket (3).
3.
Remove S-hook (11) from bumper step (9).
4.
Remove two locknuts (5), lockwashers (6), washers (7), screws (12), and bumper step (9) from
bracket (3). Discard lockwashers (6) and locknuts (5).
5.
Remove two locknuts (2), screws (4), and bracket (3) from bumper (1). Discard locknuts (2).
INSTALLATION
1.
Install bracket (3) on bumper (1) with two screws (4) and new locknuts (2).
2.
Install bumper step (9) on bracket (3) with two screws (12), washers (7), new lockwashers (6), and
new locknuts (5).
3.
Install S-hook (11) on bumper step (9).
4.
Install pin (10) on bumper step (9) and bracket (3).
5.
Install safety pin (8) in pin (10).
NOTE
Ensure step is in stowed position before truck is mobilized.
6.
Connect battery ground cable (WP 0126 00).
7.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
END OF WORK PACKAGE
12
8
6
7
5
4
9
10
2
1
3
11


Back to Top