TM-9-2320-365-20-2

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-2 - Page 285 of 1432

TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
2-1339
2-1339
2-1339
2-1339
2-1339
CONTINUITY TEST
(1)
Position circuit breaker CB1 to OFF.
(2)
Remove six screws and cover from 110/208
VAC POWER DISTRIBUTION PANEL.
(3)
Position circuit breaker CB1 to ON.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter to
left output terminal of circuit breaker CB1.
(6)
Connect negative (-) probe of multimeter to
left input terminal of circuit breaker CB1 and note
reading on multimeter.
(7)
If continuity is not present, replace circuit
breaker CB1 (para 16-65).


Back to Top