TM-9-2320-365-20-2

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-2 - Page 71 of 1432

TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
2-1125
2-1125
2-1125
2-1125
2-1125
CONTINUITY TEST
(1)
Open door on 110/208 VAC POWER
DISTRIBUTION PANEL (TM 9-2320-365-10).
(2)
Position circuit breaker CB1 to OFF
(TM 9-2320-365-10).
(3)
Remove two screws and cover from outlet
box.
(4)
Remove ballast cover from lighting fixture DS81.
(5)
Set multimeter to ohms.
(6)
Connect positive (+) probe of multimeter to
top left pole of INTERIOR LIGHTS switch
S32.
(7)
Connect negative (-) probe of multimeter to
wire 706B in lighting fixture DS81 and note
reading on multimeter.
(8)
If continuity is not present, repair or replace
wire 706B between lighting fixtures DS80 and
DS81 (para 2-40).
(9)
Install cover on outlet box with two screws.
(10)
Close door on 110/208 VAC POWER
DISTRIBUTION PANEL (TM 9-2320-365-10).


Back to Top