TM-9-2320-365-20-3

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 3 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-3 - Page 73 of 1268

TM 9-2320-365-20-3
c. Follow-On Maintenance.
(1) Install fuel ratio control tube (para 4-6).
(2) Install fuel pressure regulating valve (para 4-3).
(3) Lower cab (TM 9-2320-365-10).
(4) Start engine (TM 9-2320-365-10).
(5) Raise cab (TM 9-2320-365-10).
(6) Check for fuel leaks around fuel ratio control tube and
orifice tube assembly.
(7) Check that engine runs smoothly at low idle speed.
(8) Check that engine runs smoothly at high idle speed.
(9) Lower cab (TM 9-2320-365-10).
(10) Shut down engine (TM 9-2320-365-10).
End of Task.
4-41


Back to Top