TM-9-2320-365-20-4

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 4 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-4 - Page 599 of 968

TM 9-2320-365-20-4
c. Follow-On Maintenance.
(1) Install instrument panel assembly (para 7-15).
(2) Install personnel heater (para 18-9).
(3) Install PDP cover (para 16-2).
(4) Install windshield wipers and nozzles (para 18-3).
(5) Connect batteries (para 7-48).
(6) Check windshield wiper operation (TM 9-2320-365-10).
End of Task.
18-17


Back to Top