TM 9-2320-365-20-5
Change 2
20-515
20-88.
DIGITIZATION KIT POWER CABLE REMOVAL/INSTALLATION
This task covers:
a.
Removal
b.
installation
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10-1)
Batteries discounted (TM 9-2320-365-20-3)
Kick panel removed (TM 9-2320-365-20-4)
Power Distribution Panel removed for access
(TM 9-2320-365-20-3)
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Tool Kit Electrical Contact Repair (Item 44.1
Appendix C)
Materials/Parts
Lockwasher (2) (Item 103.1Appendix G)
Ties, Cable, Plastic (Item 76, Appendix D)
Washer, Spring (6) (Item 283, Appendix G)
Dispenser Pressure Sensitive Adhesive Tape (Item 21,
Appendix D)
Terminal Lug (Item 269.01, Appendix G)
Nut, Self-Locking (Item 132.1, Appendix G)
Personnel Required
(2)
a. Removal.
(1)
Remove nut (1), lockwasher (2), washer (3), and
terminal lug TL21 (4) from ground stud (5). Discard
lockwasher.
(2)
Disconnect terminal lug TL14 (6) from terminal block
TB2 connector 5 (7).
NOTE
•
Perform steps (1) through (4) on vehicle
serial numbers 00001 through 11437.
•
Tag connectors and connection points prior
to disconnecting.