TM 9-2320-365-20-5
20-512
Change 2
20-87
DIGITIZATION KIT CIRCUIT BREAKER REPLACEMENT/INSTALLATION
This task covers:
a.
Removal
b.
installation
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10)
Batteries discounted (para 7-48)
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Personnel Required
(2)
a. Removal.
(1)
Removal wing screw (1) from power distribution shelf
(2).
(2)
Loosen wing screw (3) on electrical distribution block
cover (4).
(3)
Remove electrical distribution block cover (4) from
power distribution shelf (2).
(4)
Locate circuit breaker to be replaced.
(5)
Remove circuit breaker (5) from power distribution
panel PD1 (6).
NOTE
All circuit breakers in digitization power
distribution panels PD1 and PD2 are replaced
the same way. One circuit breaker shown.
NOTE
Refer to
Figure 3-1. Power Distribution
Circuit Breaker Locations
and
Table 3-1
Power Distribution Circuit Breakers
for
details.