TM-9-2320-366-10-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 2 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-2 - Page 298 of 930

TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
(7) To pre-operational check MHC Overload Shutdown System (OSS) perform the
following:
(a) Place HOIST lever (1) in UP position until hook assembly (4) is against boom
nose (10).
NOTE
Hydraulic system is in by-pass mode when hydraulic system no longer
operates.
(b) Hold HOIST lever (1) in UP position until hydraulic system is in by-pass mode.
2-674


Back to Top