TM-9-2320-366-10-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 2 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-2 - Page 302 of 930

TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
f. Rotate and Telescope Boom.
WARNING
Keep boom clear of all electrical lines and other obstacles while
operating Material Handling Crane (MHC). Failure to comply may result
in serious injury or death to personnel.
NOTE
• Operate MHC control levers using even pressure. Moving lever slightly will
cause slow movement of MHC. Moving lever to full travel will cause faster
movement of MHC.
• MHC can be operated by the main control panel or by the MHC remote
control.
(1) Move SWING lever (1) to CW position to move boom (2) to the right.
(2) Move SWING lever (1) to CCW position to move boom (2) to the left.
2-678


Back to Top