TM-9-2320-366-10-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 2 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-2 - Page 647 of 930

TM 9-2320-366-10-2
3-8. OPENING BATTERY BOX/TESTING BATTERIES
This task covers:
a. Opening Battery Box
b. Testing Batteries
c.
Closing Battery Box
INITIAL SETUP
Equipment Conditions
Engine shut down (para 2-27f).
Materials/Parts
Rags, Wiping (Item 17, Appendix D)
a. Opening Battery Box.
(1) Lift two spring catches (1) and
latch levers (2) from battery box
(3).
(2) Release latches (4) from battery
box cover (5).
(3) Remove battery box cover (5) from
battery box (3).
3-115


Back to Top