TM-9-2320-366-20-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-2 - Page 71 of 1632

TM 9-2320-366-20-2
Change 2
2-958.19
CONTINUITY TEST
(1) Connect connector P110 to CTIS ECU.
(2) Remove kick panel
(para 16-3).
(3) Remove circuit breaker CB40 from PDP.
(4) Disconnect connector P111 from connector
J111.
(5) Set multimeter to ohms.
(6) Connect positive (+) probe of multimeter to
connector J111 socket E.
(7) Connect negative (-) probe of multimeter to
circuit breaker CB40 socket 7 and note
reading on multimeter.
(8) If continuity is not present, repair wire
1911 from connector J111 socket E to
circuit breaker CB40 socket 7 (para 2-45)
or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(9) If continuity is present, replace CTIS cable
assembly (para 7-60).
(10) Install circuit breaker CB40 on PDP.
(11) Connect connector J111 to connector
P111.
(12) Install kick panel (para 16-3).


Back to Top