TM-9-2320-366-20-3

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 3 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-3 - Page 1066 of 1396

TM 9-2320-366-20-3
7-64. RIGHT-HAND DOOR AND CAB MARKER LIGHTS CABLE ASSEMBLY
REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (para 7-57).
PDP cover removed (para 16-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Materials/Parts
Ties, Cable, Plastic (Item 69, Appendix D)
Lockwasher (4) (Item 82, Appendix G)
Lockwasher (2) (Item 88, Appendix G)
Gasket (2) (Item 24, Appendix G)
a. Removal.
NOTE
• Note routing of right-hand door and cab marker
lights cable assembly prior to removal.
• Remove plastic cable ties as required.
(1) Remove three screws (1) and washers (2) from PDP (3).
(2) Remove three screws (4) from PDP (3).
(3) Lift PDP (3) outward to gain access.
(4) Remove two nuts (5), lockwashers (6), washers (7), and
cover (8) from terminal board TB1 (9).
Discard
lockwashers.
(5) Disconnect terminal lug TL73 (10) from terminal board
TB1 (9) position 1.
(6) Disconnect terminal lug TL71 (11) from terminal board
TB2 (12) position 2.
7-310
Change 1


Back to Top