TM-9-2320-366-20-3

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 3 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-3 - Page 381 of 1396

TM 9-2320-366-20-3
CONTINUITY TEST
(1) Remove circuit breaker CB10 from Power
Distribution Panel (PD1).
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
one terminal of circuit breaker CB10.
(4) Connect negative (-) probe of multimeter to
other probe of circuit breaker CB10 and
note reading on multimeter.
(5) If continuity is not present, replace circuit
breaker CB10 (para 20-80).
(6) If continuity is present, perform Special
Purpose Kit Troubleshooting task x1. No
Power to Digitization Rack.
Perform steps (7) through (10), if
continuity is present through circuit
breaker CB10.
(7) Install circuit breaker CB10 in Power
Distribution Panel (PD1)
(8) Position electrical distribution block cover
on power distribution shelf.
(9) Tighten wing nut on electrical distribution
block cover.
(10) Install wing screw on power distribution
shelf.
NOTE
All data on pages 2-2308 through 2-2371,
including pages 2-2309 through 2-2370 deleted.
Change 2
2-2307/(2-2308 Blank)


Back to Top