TM 9-2320-366-20-4
7-110. M1089 CRANE POWER CABLE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
MHC erected (TM 9-2320-366-10-2).
Engine shut down (TM 9-2320-366-10-1).
Batteries disconnected (para 7-57).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Tool Kit, Electrical (Item 45, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 20, Appendix D)
Ties, Cable, Plastic (Item 69, Appendix D)
Varnish, Oil (Item 70, Appendix D)
Lockwasher (8) (Item 102, Appendix G)
Nut, Self-Locking (2) (Item 135, Appendix G)
a. Removal.
NOTE
Remove plastic cable ties as required.
(1) Remove eight screws (1), lockwashers (2), and washers
(3) from control panel cover (4). Discard lockwashers.
(2) Remove two self-locking nuts (5), four washers (6), two
screws (7), and control panel top cover (4) from control
panel (8). Discard self-locking nuts.
NOTE
Tag wires and connection points prior to
disconnecting.
(3) Loosen screws (9 and 10) on terminal board (11)
positions 7A and C.
(4) Remove black wire (12), green wire (13), and shield (14)
from terminal block (11).
7-553