TM 9-2320-366-20-5
Change 2
20-435
20-75.
M1085 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT INSTALLATION/
REMOVAL
This task covers:
a.
Installation
b.
Removal
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Cargo bed side panels and stakes removed (TM 9-2320-
366-10-1).
Tools and Special Tools
Drill set, Twist (Item 8, Appendix C)
Drill, Portable, Electric (Item 7, Appendix C)
Tap, Thread, Cutting (Item 41.3, Appendix C)
Tap and Die Set (Item 41.2, Appendix C)
Tool Kit, Genl Mech (Item 46, Appendix C)
Sling, Cargo (2) (Item 31, Appendix C)
Materials/Parts
Nut, Self-Locking (4) (Item 159, Appendix G)
Lockwasher (8) (Item 73.1, Appendix G)
Personnel Required
(2)
a. Installation.
(1)
Measure and mark a line (1) 1.25 in (32 mm) down
from upper RH corner of tiedown bracket (2).
(2)
Measure and mark a line (3) 4.4 in (109 mm) from
RH side of line (1).
(3)
Measure and mark a line (4) 4.72 in (120 mm) from
RH side of line (3).
NOTE
Overall height for shelter models A, B, or C
is 83 1/2 to 89 in. (214 to 226 cm).
If shelter
height is below 83 1/2 in. (214 cm), shorten
cable to remove slack in turnbuckle
assembly.
NOTE
•
Perform steps (1) through (6) on
tiedowns not originally modified.
•
All tiedowns are modified the same way.
RH front tiedown shown.
•
Measurements will be taken from upper
LH corner on LH tiedown bracket.