TM 9-2320-366-20-5
20-514
Change 2
20-80.
DIGITIZATION KIT CIRCUIT BREAKER REPLACEMENT
This task covers:
a.
Removal
b.
installation
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1)
Batteries discounted (para 7-57)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Personnel Required
(2)
a. Removal.
(1)
Removal wing screw (1) from power distribution
shelf (2).
(2)
Loosen wing screw (3) on electrical distribution
block cover (4).
(3)
Remove electrical distribution block cover (4) from
power distribution shelf (2).
(4)
Locate circuit breaker to be replaced.
(5)
Remove circuit breaker (5) from power distribution
panel PD1 (6).
NOTE
All circuit breakers in digitization power
distribution panels PD1 and PD2 are
replaced the same way. MTS Power CB10
NOTE
Refer to
Figure 3-1. Power Distribution
Circuit Breaker Locations
and
Table 3-1
Power Distribution Circuit Breakers
for
details.