TM 9-2320-366-20-5
Change 2
20-517
20-81.
DIGITIZATION KIT POWER CABLE REMOVAL/INSTALLATION
This task covers:
a.
Removal
b.
installation
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1)
Batteries discounted (para 7-57)
Kick panel removed (para 16-3)
Power Distribution Panel removed for access
(para 16-2)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Tool Kit Electrical Contact Repair (Item 45
Appendix C)
Materials/Parts
Lockwasher (2) (Item 113.1, Appendix G)
Ties, Cable, Plastic (Item 69, Appendix D)
Lockwasher (6) (Item 107.1, Appendix G)
Dispenser Pressure Sensitive Adhesive Tape (Item
20, Appendix D)
Terminal Lug (Item 279.01, Appendix G)
Nut, Self-Locking (Item 146.1, Appendix G)
Personnel Required
(2)
a. Removal.
(1)
Remove nut (1), lockwasher (2), washer (3), and
terminal lug TL21 (4) from ground stud (5). Discard
lockwasher.
(2)
Disconnect terminal lug TL14 (6) from terminal block
TB2 connector 5 (7).
NOTE
Perform steps (1) through (4) on vehicle
serial numbers 00001 through 11437.