TM 9-2320-366-20-5
23-12. WET TANK REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Pressure protection valve removed (para 11-29).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item
20, Appendix D)
Antiseize Compound (Item 58, Appendix D)
Nut, Self-Locking (2) (Item 130.1, Appendix G)
WARNING
Wear appropriate eye protection when
working
under
vehicle
due
to
the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
NOTE
Tag hoses and connectors prior to removal.
(1) Disconnect three air hoses (1) from wet tank (2).
(2) Disconnect connector P84 (3) from pressure switch (4).
23-50
Change 1