TM 9-2320-366-34-3
15-136.2
Change 2
15-9.
CARGO BED REPLACEMENT/REPAIR (CONT)
(2)
Remove nut (7), spacer (8), teflon washer (9), D-
ring (10), and D-ring (11) from cast tie down cup
(12).
j. Tie Down Installation
(1) Position D-ring (1) in D-ring retainer (2).
(2) Position teflon washer (3) on D-ring retainer (2).
(3) Position D-ring retainer (2) in stamped tie down cup
(4).
(4) Position washer (5) and nut (6) on D-ring retainer (2).
(5) Tighten nut (6) to 76-94 lb-ft (103-128 N•m).
NOTE
Perform step (2) on tie down with cast cups.
NOTE
•
There are two types of tie down cups
installed on cargo beds.
On the underside,
stamped cups have raised center sections
and cast cups have flat center sections.
•
Steps (1) through (10) require the aid of an
assistant.
•
Perform steps (1) through (5) on tie downs
with stamped cups.