TM 9-22320-366-34-3
Change 2
16-481
16-79.
M1089 FLOWMETER VALVE ASSEMBLY REPLACEMENT/ADJUSTMENT
This task covers
a. Removal
b. Installation
c. Adjustment
d.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Underlift lowered (TM 9-2320-366-10-2).
Batteries disconnected (TM 9-2320-366-20-3).
Hydraulic reservoir supply and return valve closed (TM
9-2320-366-10-2).
Tools/Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Tools/Special Tools (Cont)
Sling, Cargo (Item 56, Appendix B)
Materials/Parts
Nut, Self-Locking (8) (Item 211, Appendix F)
Packing, Preformed (2) (Item 237, Appendix F)
Personnel Required
(2)
a.
Removal.
(1)
Remove nut (1) and bracket (2) from tool box (3).
(2)
Remove nut (4) and towbar (5) from tool box (3).
WARNING
NOTE
•
This procedure applies to both the upper
and lower flowmeter valve assemblies. The
upper flowmeter valve assembly is shown.
•
The upper flowmeter valve assembly must
be removed first.
Towbar weighs approximately 150 lbs
(68 kgs).
Attach a suitable lifting device
prior to removal.
Failure to comply may
result in injury to personnel or damage
to equipment.
NOTE
Steps (2) requires the aid of two assistants.