TM-9-2320-386-24-1-1

2-1/2-TON, 6X6, M44A3 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; EXTENDED SERVICE PROGRAM (ESP); UNIT, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL; VOLUME 1 OF 2

MAY 2001

  TM-9-2320-386-24-1-1 - Page 505 of 1078

TM 9-2320-386-24-1-1
0132 00
TRANSMISSION SHIFT CABLE MAINTENANCE (Contd)
REMOVAL
1.
Remove cotter pin (7) and shift cable (3) from manual control lever (8). Discard cotter pin (7).
2.
Remove two nuts (6), lockwashers (5), U-bolt (1), shift cable (3), and spacer (2) from bracket (4).
Discard lockwashers (5).
3.
Loosen jamnut (11) and remove connecting link (10) from shift cable (3).
4.
Remove shift cable (3) from vehicle.
INSTALLATION
1.
Route shift cable (3) to transmission (9) through hole in cab tunnel.
2.
Install connecting link (10) to center of threads on end of shift cable (3) to allow for further
adjustment. Do not tighten jamnut (11).
3.
Install spacer (2) and shift cable (3) on bracket (4) with U-bolt (1), two new lockwashers (5), and
nuts (6).
ADJUSTMENT
1.
Move manual control lever (8) to full forward 1 (first) gear position and adjust connecting link (10) in
or out on threads of shift cable (3) to align with hole in lever (8) and tighten jamnut (11).
2.
Install connecting link (10) on lever (8) with new cotter pin (7).
3.
Install transmission select lever (WP 0134 00).
0132 00-2
9
7
8
6
5
4
2
3
11
1
10
END OF WORK PACKAGE


Back to Top