TM-9-2320-386-24-1-1

2-1/2-TON, 6X6, M44A3 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; EXTENDED SERVICE PROGRAM (ESP); UNIT, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL; VOLUME 1 OF 2

MAY 2001

  TM-9-2320-386-24-1-1 - Page 687 of 1078

0180 00-4
TM 9-2320-386-24-1-1
0180 00
PITMAN ARM MAINTENANCE (Contd)
INSTALLATION
1.
Align marks on pitman arm (3) and shaft (4) and slide pitman arm (3) on shaft (4) until threaded
end of shaft (4) is exposed.
2.
Install new lockwasher (2) and nut (1) on shaft (4). Tighten nut (1) 180-200 lb-ft (244-271 N
m).
3.
Install drag link (6) on pitman arm ball (8).
4.
Lubricate drag link (6) with (GAA) grease.
5.
Tighten adjusting plug (7) until seated (metal-to-metal), then back off adjusting plug (7) (minimum
one-half turn), and install new cotter pin (5).
6.
Install stone shield (10) on studs (12) with two nuts (9). Tighten nuts (9) 60-80 lb-ft (81-108 N
m).
7.
Install stone shield (10) on flange (11) with two new lockwashers (13) and screws (14). Tighten
screws (14) 81-104 lb-ft (110-141 N
m).
8.
Repeat steps 6 and 7 to install two stone shields.
1
2
3
8
7
6
4
5
3
4
ALIGNMENT
MARKS


Back to Top